DSpace Repository

ESP PRODUCTION OPTIMIZATION BY USING PIPESIM

Show simple item record

dc.contributor.author Ghayth, Salim
dc.contributor.author Ghayth, Abdulrauof
dc.contributor.author Ghayth, Abdulrauof
dc.contributor.author Hamed, Ghaith
dc.date.accessioned 2025-07-27T10:21:56Z
dc.date.available 2025-07-27T10:21:56Z
dc.date.issued 2025-06-25
dc.identifier.issn 2518-5454
dc.identifier.uri http://dspace-su.server.ly:8080/xmlui/handle/123456789/3421
dc.description.abstract Artificial lift systems are among the most extensively employed production methods. Lift methods are required to facilitate production in wells that cannot produce liquids to the surface under their pressure. One of the important types of artificial lift methods, which is lowers the producing bottom hole pressure on the formation to obtain a higher production rate from the well. It is an efficient and reliable method for lifting moderate to high volumes of fluids from wellbores. This study aims to design & Simulate an Electrical submersible pump by using PIPESIM software also to change WC, GOR and Tubing size to observe the effects of each one of them on the ESP design and on production system. The input data from the Nafoora oil field that is operated by the Arabian Gulf Oil Company (AGOCO) a subsidiary of the state owned national oil corporations (NOC). en_US
dc.language.iso other en_US
dc.publisher جامعة سرت universtiy sirt en_US
dc.relation.ispartofseries المُجلد الخامس عشر: العدد الأول - مايو 2025;53-57
dc.subject ESP, en_US
dc.subject Artificial lift, en_US
dc.subject WC, en_US
dc.subject , PIPESIM en_US
dc.subject GOR en_US
dc.title ESP PRODUCTION OPTIMIZATION BY USING PIPESIM en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account