Abstract:
In this paper, a field study is conducted on proving a positive displacement meter with bi-directional pipe provers to determine the repeatability of the meter's generated pulses and the deviation of the Meter Factor percentage during the Meter Proving process at Zueitina Oil Port in Libya. Equipment, procedures, requirements, national and international standards, and precautions that will ensure accurate metering of fluids were considered.